For those of you who are list people, here's a list of the things we have done on the house in the last month and a half:
Completed shingled roof
Insulated ceiling of great room
Removed brick on existing house at openings
Shopped for walnut slabs for countertop (some but not all surfaces--we are mixing with granite) in my parent's side yard
More windows installed
Interior framing: peninsula and pantry in kitchen/DR, closets in MBR
HVAC installed on all additions
Cut a hole into our existing living room
Drywalled
Some mudding/taping
Cleared out the existing kitchen
Demoed kitchen!!
Expanded kitchen
Leveled out the flooring from existing to new
Received cabinet delivery
Installed electrical and plumbing in kitchen
Cut another hole into our living room
Removed old flooring in kitchen
Installed cabinets
On the design end of things:
Ordered received cabinet handles
Measured for countertops
Ordered appliances
Ordered hardwood flooring
Ordered some light fixtures
Ordered sink/plumbing fixtures
Shopped to match existing brick/mortar
Ordered sectional for new Great Room!
Designed a built-in walnut desk/TV area in Great Rm
And lots of other things I'm sure I missed!
Here are some details/pics of the process for those of you who enjoy that sort of thing--
Starting with finishing up the shingles on the roof:
An in process shot--not too many of those here, not sure why!
Didn't realize I didn't have any closer up pics of the finished shingled roof until just the other day! So here you go: green grass, blue sky, dirt piles, and little boys with shovels:
Couple windows installed:
Dining Room window about to go in |
Large ones going in! Contractor Dave had Gabe's help on that one:
Sadly, it will be a while before the trapezoid/triangular ones on top are ready to go in:
All suited up with tarp |
On to brick removal of the wall coming down to create a bigger kitchen:
A couple of loud days later, the brick was finally removed.
Don't mind the blurry child flash of lightning in the lower right hand corner :) |
In which one is seen here:
He removed brick where the doorway will be into the master bedroom. Where the window is will be another doorway into an ensuite master bathroom (formerly Zoe's room). The other window being bricked over is to the right of the doorway:
Judah is not super happy his window is being bricked over! |
One weekend we went over to my parents place to "shop" for some walnut slabs. My parents had a walnut tree come down (accidentally landed on their car--but that's another story for another time ;) and got it sawn into slabs for an opportunity such as this. They have been sitting in my parents yard under a tarp for quite some time now, so we went to go take a look. The plan is to use live edge walnut for the west wall countertop and the bar top. We also have in mind to put a built in live edge walnut desk to the right of the brick stack in the Great Room. So, we were looking at the slabs, and decided on taking two roughly 15' long slabs, approximately 2" thick to get planed down to 1.5" thick for the countertops and a roughly 8' long slab for the desk, this one being about 17" wide. There were other smaller slabs to be planed down to 3/4" thick to use as live edge shelves on the brick and open shelves in the kitchen.
Isn't this exciting??? I can't wait to see them all cleaned up!!!!! !!
Next, Dave installed baffles in the Great Room ceiling to vent the air up to the ridge vent to go under the insulation.
Yes, they are pink |
Woo hoo!!!
A perspective from the other side:
Some kitchen framing pics:
This next picture shows the opening Dave uses to get into the space so he didn't have to come thru our living room all the time. It was connected to the front porch by a 2'x12' plank that spanned about 14' and at one end was about 10' off the ground. Which, ahem, Zoe NEVER walked across without us....
And then, it was time to drywall the ceiling. But not without first, the excitement of watching the delivery truck unload it.
Dave had someone come help him with drywall for the ceiling, since he was using long 12' pieces.
And then, over in the west wing master bedroom addition:
From inside one of the closets:
Back to just Dave still in the west wing:
Moving around the room clockwise:
More drywall pics in the east wing:
Taken from my existing kitchen window |
On to some mudding and taping of drywall:
Taking a walk thru the space, counter-clockwise:
Take one last look at this window wall as it's coming out in a couple days!!!! |
Amongst the drywall, mudding and taping, Dave worked with Furlong's Sheetmetal subcontractor to get HVAC set up for the new space. Fortunately, right after we bought the house in 2013, we decided to outfit it with a bigger furnace (and moved to a better location) that would accommodate a major renovation we were only toying with at the time. Well, down the road, we DID decide to take on a major renovation/addition project now, didn't we? So that worked out nicely to not have to deal with that all the while. It was a relatively smooth 2-3 day process, with a team of about 4 guys working in various parts of the house adding vents, ducts and things. I asked Gabe one day, "our bedroom (in the basement) is the only one that won't be touched, right?? a sanctuary of sorts with all this reno???" Nope, think again. The main trunk line duct runs straight thru our room and Gabe created (since we did our bedroom in the basement ourselves) a removable panel over the duct for just such an occasion. We had to clear out a space in our room (mostly Gabe's closet) for them to tie in the new venting system with the existing one. So that is what we did, and boom-bada-bing, back in business, with very little hassle and mess. I call that a Gabe win!
So, we now have working HVAC for the new spaces. But, being that there is still one crucial window we are waiting on, exhibit A:
we still have most of the vents closed. Thankfully, it just so happens to be warming up weather-wise so we aren't needing HVAC quite as much now. The weather will be a consideration with the cabinets coming in to have a climate controlled space to put them.
Here's the cliff hanger I'll leave you with---
Pictures of a cleaned out kitchen, ready to be demoed!!!!
Not keeping backsplash (it's a peel 'n stick tile, meant for temporary use) |
Demo day, here we come!!!!
Stay tuned.....
No comments:
Post a Comment